Home > Local Rules > Corte Madera
Martha Battaglia mbattaglia@cortemadera.gov
Standards | Details |
|---|---|
Zones allowed | All residential and mixed-use zones with limited exceptions. |
Lot Restrictions | Lot Coverage: An ADU may exceed standards for lot coverage, but the ADU is limited to a maximum size of 800 square feet Restrictions: Number of ADUs is limited in Christmas Tree Hill Overlay district. |
Minimum Lot Size | None. |
Min/Max ADU Size | Minimum: 150 square feet (minimum permitted by building code at time of application) Maximum: 800 square feet if the ADU exceeds standards related to lot coverage, floor area ratio, or reduces side or rear yard setbacks JADUs Maximum: 500 square feet. One detached ADU and one JADU allowed on each single-family property. Also allowed on multifamily properties under state law. Maximum of 2 bedrooms. |
ADU Building Height | Up to 16 feet and one story. If 50% or more of ADU is above an existing or proposed garage, the total combined structure up to 25 feet. |
Setbacks | None for conversions of existing living area or structure. 4-foot side and rear setbacks for new construction. When a side yard or rear yard setback is reduced, the ADU is limited to a maximum size of 800 sf. Side and rear setbacks must meet fire safety requirements. |
Parking Requirements | One parking space per ADU unless 1) within ½ mile of transit, historic district or car share, 2) located within an existing structure, or 3) created by converting or demolishing garage or carport, then none required. Tandem parking and parking in setbacks are both allowed. |
Owner Occupancy | Not required for ADU or primary residence. Required for JADU. |
Sample fees from recent permits | Example 1: Example 2: *Fees are specific to each project and will vary. Fees change regularly. These are provided as examples only. |
Other requirements | Exterior Lighting: must be dark sky compliant and/or have a BUG rating of B5, U0 and G5 or less, with a color temp of 3500K or lower (warm not cool). Filaments, light sources or lenses must be shielded with opaque materials and not visible at property lines. |
Process | ADU Permit not required for JADUs, ADUs within existing structures, or detached ADUs 800 sf or less; only a Building Permit needed. Attached ADUs or detached ADU more than 800 sf are processed through a ministerial approval process with an application fee of $850. |
Exceptions | No setback is required for: |
Subscribe to the ADU Marin Newsletter
Periodic updates, stories, and resources to support your ADU project.
ADU Process
Resources
Produced by Community Planning Collaborative